Subscribe free to our newsletters via your
. Solar Energy News .




SPACE TRAVEL
NASA Progressing Toward First Launch of Orion Spacecraft
by Staff Writers
Huntsville AL (SPX) Dec 17, 2012


This past week, engineers at NASA's Marshall Space Flight Center in Huntsville, Ala., received materials to begin manufacturing the adapter that will connect the Orion capsule to a United Launch Alliance Delta IV heavy-lift rocket for EFT-1.

Recent engineering advances by NASA and its industry partners across the country show important progress toward Exploration Flight Test-1 (EFT-1), the next step to launching humans to deep space.

The uncrewed EFT-1 mission, launching from NASA's Kennedy Space Center in Florida in 2014, will test the re-entry performance of the agency's Orion capsule, the most advanced spacecraft ever designed, which will carry astronauts farther into space than ever before.

"These recent milestones are laying the foundation for our first flight test of Orion in 2014," said Dan Dumbacher, deputy associate administrator for exploration systems development at NASA Headquarters in Washington.

"The work being done to prepare for the flight test is really a nationwide effort and we have a dedicated team committed to our goal of expanding the frontier of space."

A tool that will allow the titanium skeleton of the Orion heat shield to be bolted to its carbon fiber skin is at the Denver facility of the spacecraft's prime contractor Lockheed Martin.

This will enable workers to begin assembling the two pieces of the heat shield. Almost 3,000 bolts are needed to hold the skeleton to the skin. A special stand was built to align the skin on the skeleton as holes for the bolts are drilled.

Work to bolt the skeleton to the skin will be completed in January. The heat shield then will be shipped to Textron Defense Systems near Boston where the final layer, an ablative material very similar to that used on the Apollo spacecraft, will be added. The completed heat shield is scheduled to be ready for installation onto the Orion crew module at Kennedy next summer.

To test the heat shield during EFT-1's re-entry, Orion will travel more than 3,600 miles above Earth's surface, 15 times farther than the International Space Station's orbital position. This is farther than any spacecraft designed to carry humans has gone in more than 40 years. Orion will return home at a speed almost 5,000 mph faster than any current human spacecraft.

This week, engineers at NASA's Marshall Space Flight Center in Huntsville, Ala., received materials to begin manufacturing the adapter that will connect the Orion capsule to a United Launch Alliance Delta IV heavy-lift rocket for EFT-1.

Two forward and two aft rings will be welded to barrel panels to form two adapters. This adapter design will be tested during EFT-1 for use during the first launch of NASA's next heavy-lift rocket, the Space Launch System (SLS), in 2017. SLS will launch NASA's Orion spacecraft and other payloads beyond low Earth orbit, providing an entirely new capability for human exploration.

Data from the adapter on the flight test will provide Marshall engineers with invaluable experience developing hardware early in the design process. Designing the adapter once for multiple flights also provides a cost savings.

Of the two adapters welded at Marshall, one will attach Orion to the Delta IV heavy-lift rocket used for EFT-1. The other adapter will be a structural test article to gain knowledge on the design.

NASA's Ground Systems Development and Operations (GSDO) Program also has passed a major agency review that lays the groundwork at Kennedy to support future Orion and SLS launches.

The GSDO Program completed a combined system requirements review and system definition review, in which an independent board of technical experts from across NASA evaluated the program's infrastructure specifications, budget and schedule.

The board confirmed GSDO is ready to move from concept development to preliminary design. The combination of the two assessments represents a fundamentally different way of conducting NASA program reviews. The team is streamlining processes to provide the nation with a safe, affordable and sustainable launch facility.

The GSDO program last week also led the third Stationary Recovery Test Working Group session in Norfolk, Va. The team presented to the U.S. Navy detachment that will recover the capsule during EFT-1 a complete list of tasks required to accomplish stationary recovery test objectives. The working group outlined the plan for roles and responsibilities to accomplish required test procedures.

Included in these presentations were the commanding officer of the USS Mesa Verde and the fleet forces command director of operations, who both expressed complete support for the test.

.


Related Links
Crew Vehicle and Launch System
Space Tourism, Space Transport and Space Exploration News






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








SPACE TRAVEL
New member of the exclusive space club
Moscow (Voice of Russia) Dec 17, 2012
The successful launch of North Korea's Unha-3 rocket on December 12, 2012 became the top news in the world of cosmonautics. Even the previous day's story of the United States launching, for the third time, its X-37B unmanned experimental OTV-3 ("Orbital Test Vehicle") was eclipsed by Unha-3. The flight's duration, aims and objectives though have yet to be disclosed. News of the successful ... read more


SPACE TRAVEL
NC State Study Offers Insight Into Converting Wood to Bio-Oil

Can Algae-Derived Oils Support Large-Scale, Low-Cost Biofuels Production?

Plastic packaging industry is moving towards completely bio-based products

Gases from Grasses

SPACE TRAVEL
Research: Tiny robots may think as a group

Custom robots could do Fukushima cleanup

Swimming robot crosses Pacific Ocean

Squirrels and Birds Inspire Researchers to Create Deceptive Robots

SPACE TRAVEL
Ground broken on Irish Midlands wind farm

GE, MetLife and Union Bank Invest in Kansas Wind Farm

Wind speeds in southern New England declining inland, remaining steady on coast

Brazil advances wind power development

SPACE TRAVEL
Ultrasound can now monitor the health of your car engine

Chinese firm to build electric cars in Bulgaria: report

Philippines gives green-light to electric tricycles

Apple Maps glitch could be deadly: Australian police

SPACE TRAVEL
Turkey, Iraq Kurds near explosive oil deal

Iran oil revenues halved by sanctions: minister

Trio Merger Corp. and SAE agree to merge

Incoming Japan PM pledges no compromise on islands

SPACE TRAVEL
Japan to host nuclear safety conference in Fukushima

British regulators OK nuke reactor design

EU funds frozen for Lithuanian nuclear decommissioning

LA wants public hearings on nuke plant

SPACE TRAVEL
Bolivia's eco-friendly trans-oceanic ships

Renewables Provide 46 percent All New US Electrical Generating Capacity in 2012

OpenADR Continues to Move the Smart Grid Forward

California's Energy Future: Buildings and Industrial Efficiency

SPACE TRAVEL
If you cut down a tree in the forest, can wildlife hear it?

Warming climate unlikely to cause extinction of ancient Amazon trees

Xmas tree genome very much the same over the last 100 million years

As Amazon urbanizes, rural fires burn unchecked




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement