Solar Energy News  
ROCKET SCIENCE
NASA's big new moon rocket is stacked, awaiting launch
by Paul Brinkmann
Washington DC (UPI) Nov 8, 2021

NASA's Orion spacecraft is shown stacked on top of the SLS rocket inside the Vehicle Assembly Building at Kennedy Space Center in Florida on Friday in preparation for a planned launch in early 2022 to the moon.

NASA is nearing the final stages of rehearsal and checkouts of the Artemis I moon rocket -- the first rocket of its kind since the Apollo program -- before an uncrewed launch from Florida around the moon planned for early next year.

The 322-foot-tall SLS rocket and Orion capsule are completely assembled and stacked at Kennedy Space Center, a glowing orange and white tower reaching almost as high as the massive Saturn rockets of the Apollo era.

"We're in that final 10 yards to the finish line, and the excitement is definitely building," Amy Marasia, the NASA Orion spacecraft production branch lead, said in an interview Friday at the space center.

"There are no astronauts on this flight, but it's going to the moon, to be in orbit around the moon for weeks -- this scope of a mission hasn't happened in 50 years."

The massive Vehicle Assembly Building, in which Saturn rockets and space shuttles once stood, is home to the SLS as it enters the final phase of testing before launch.

The space agency allowed media photographs of the stacked rocket for the first time Friday.

Marasia has worked on NASA projects for 27 years, starting as a contractor on the Constellation program, which also was to take astronauts to the moon. The Obama administration canceled that program in 2010, but NASA continued with designs for the Orion capsule and eventually the SLS rocket.

"There have been delays, but I never doubted we'd get to this point again, ready to launch," Marasia said. "Even through the COVID-19 shutdowns, work never stopped on Orion."

The Orion capsule for Artemis I is similar to that in which astronauts will fly, but lacks a waste-handling system, crew displays and manual controls for navigation, Marasia said.

Meanwhile, pieces of the upcoming Artemis missions, which will carry people, are coming together in other buildings around the space center.

Technicians are assembling two more Orion capsules, for Artemis I and Artemis II, in the high-ceiling, white clean room at the Operations and Checkout Building.

The second stage for the Artemis II rocket awaits stacking in a hangar at nearby Cape Canaveral Space Force Station.

Once it launches, NASA will collect data first from rocket and and then for weeks from capsule as it orbits the moon, flies 40,000 miles past and returns to a splashdown in the Pacific Ocean.

NASA plans to land astronauts on the moon by 2024, but the agency has acknowledged that goal may be difficult to achieve due to a lack of congressional funding.

The space agency plans to roll out the SLS rocket out to Launch Complex 39B in January for a complete countdown rehearsal, with the first launch window expected to be Feb. 12 to 27.

"We did perform our first power-up on top of the SLS, and at the end of this month we're going to perform our first integrated power-up with the rocket," Laura Poliah, NASA Orion test lead, said in an interview.

"We'll also be testing communications, all the signals ... making sure we can communicate with the vehicle when it's orbiting the moon."

The uncrewed launch and extended flight around the moon should yield some new information, even surprises, that will help make crewed missions better, said Amanda Stevenson, operations lead for NASA's Crew Module Adapter assembly.

"It's indescribable to see the rocket and capsule all put together now," Stevenson said. "We seen it in computer designs, in drawings, and now we've seen it. It's surreal, and it give us all a real sense of accomplishment."


Related Links
Rocket Science News at Space-Travel.Com


Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only


ROCKET SCIENCE
Major Artemis engine part arrives at Stennis for certification testing
Bay St. Louis MS (SPX) Nov 02, 2021
The first four Artemis missions will use NASA's 16 upgraded RS-25 engines that previously powered space shuttle flights. For future flights on the Space Launch System (SLS), NASA and prime contractor Aerojet Rocketdyne are changing the way they build major parts for the RS-25. Engineers and technicians are fabricating some of these parts using advanced manufacturing techniques that increase reliability while reducing both the cost and time to build the engine. The first RS-25 powerhead produced by ... read more

Comment using your Disqus, Facebook, Google or Twitter login.



Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle

ROCKET SCIENCE
Aircraft can get higher and greener from doped fuels

Bioenergy crops better for biodiversity than food-based agriculture

Recycling CO2 to fuel a carbon-neutral future

Converting methane to methanol - with and without water

ROCKET SCIENCE
This robot doesn't need to knock

A personalized exosuit for real-world walking

Giving robots social skills

They'll lead the robots out

ROCKET SCIENCE
Green hydrogen from expanded wind power in China

Scientists bring efficiency to expanding offshore wind energy

From oil to renewables, winds of change blow on Scottish islands

US unveils plans for seven major offshore wind farms

ROCKET SCIENCE
Top carmaker Toyota defends skipping COP26 emissions pledge

Producers target 2040 end date for polluting vehicles

DoorDash takes aim at Europe with purchase of Wolt

Battle the algorithms: China's delivery riders on the edge

ROCKET SCIENCE
Calling all "fusioneers"! New US fusion energy website launches

Feeling the heat: Fusion reactors used to test spacecraft heat shields

Visualizing the microscopic world of fast ions in fusion devices

Neutral particles a drag on disruptive plasma blobs

ROCKET SCIENCE
Rolls-Royce launches nuclear reactor business

Greenland passes law banning uranium mining

Macron says France to build more nuclear reactors

Options for the Diablo Canyon nuclear plant

ROCKET SCIENCE
COP26 strikes hard-fought deal but UN says 'not enough'

World needs trillions to face climate threat: draft UN report

COP26 draft urges boost to emissions cutting goals by 2022

Countries far apart as climate talks enter final week

ROCKET SCIENCE
Amazon deforestation hits monthly record in Brazil

Deforestation drives increasingly deadly heat in Indonesia: study

Climate change and fires: Bolivia's forests in peril

'We can't live in a world without the Amazon': scientist









The content herein, unless otherwise known to be public domain, are Copyright 1995-2024 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. All articles labeled "by Staff Writers" include reports supplied to Space Media Network by industry news wires, PR agencies, corporate press officers and the like. Such articles are individually curated and edited by Space Media Network staff on the basis of the report's information value to our industry and professional readership. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. General Data Protection Regulation (GDPR) Statement Our advertisers use various cookies and the like to deliver the best ad banner available at one time. All network advertising suppliers have GDPR policies (Legitimate Interest) that conform with EU regulations for data collection. By using our websites you consent to cookie based advertising. If you do not agree with this then you must stop using the websites from May 25, 2018. Privacy Statement. Additional information can be found here at About Us.